Offloading a 1,300 ton Hydrocracker
Customer: Beluga Projects Logistic, CJSC
Location:Russia
Challenge:Beluga was tasked with offloading a hydrocracker weighing 1,306 tons from a barge and bringing it onshore. Due to the weight and length of the hydrocracker utilizing a crane was not an option.
Solution:Beluga utilized two SBL1100 gantry systems to lift the hydrocracker off the barge onto a Self-Propelled Modular Trailer (SPMT). The SPMT then carried the hydrocracker to shore.
Products:Two sets of four SBL1100 Gantries
Year:2014